Showing posts with label Design-Build. Show all posts
Showing posts with label Design-Build. Show all posts

Monday, January 26, 2015

Seminar: Alternative Project Delivery

Seminar:  Alternative Project Delivery

When:  Friday, March 13, 2015 (all day) 

Where:  Bellevue, WA (Red Lion Inn) 

Agenda:  In the last few years there have been significant changes to the General Contractor/Construction Manager delivery method to include Heavy Civil Construction projects, and to the Design-Build delivery method to include Progressive Design-Build.  This seminar will have presentations from owners, contractors, and consultants on how they select and manager Alternative Project Delivery, and the risks and benefits associated with these delivery methods.

Sponsored by:  Pacific Northwest Chapter of CMAA (Construction Management Association of America


Presidential History:
  • Presidential History Blog:   While I will discontinue writing this Public Contracting Blog on March 5, 2015, you can sign up for a free email subscription to my Presidential History Blog at www.PresidentialHistory.com.  On a case-by-case basis, I will only be accepting limited consulting and training opportunities after March 5, 2015.
Mike Purdy's Public Contracting Blog
© 2015 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Tuesday, December 16, 2014

Why Designers and Contractors Sometimes Don't Like Design-Build

Design-Build is growing in popularity among public agencies.  It can be a good tool, but depending on how the selection process is structured, it can be problematic and cause unintended consequences for the project, owner, and Design-Builder. 

Price in the selection process:  One of the key issues to decide in developing a Design-Build selection process is how much price be considered.  There are two basic models on this.
  • Limited prices:  In this model, often known as Progressive Design-Build, the owner asks for cost or price-related factors, perhaps the fee (overhead and profit) and general conditions costs.  The construction cost is then negotiated when the design is sufficiently complete.  This avoids requiring the Design-Builder to come up with a complete cost early on when not enough is known about the project.
Steve McNutt
  • Full price:  In this model, the owner asks the competing firms to submit their full price for designing and building the project as part of the selection process.  There are serious challenges associated with this model.  Rather than try to summarize those problems here, I refer you to an excellent, short, and very readable article by Steve McNutt, Principal with NAC Architecture in Spokane, WA that appeared in the Seattle Daily Journal of Commerce on October 30, 2014.  Click here to read the article: "D/B competitions: a high-stakes poker game you can't win."
Washington state law:  RCW 39.10.330 was modified in 2014 to permit public agencies to request in the selection process "cost or price-related factors" (Progressive Design-Build), rather than the complete price.
Mike Purdy's Public Contracting Blog
© 2014 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Monday, December 15, 2014

2015 Design-Build Conference in San Antonio

The Design-Build Institute of America (DBIA) will sponsor their annual Design-Build Conference for 2015 in San Antonio, Texas.

When:  
Where:  San Antonio, Texas

Registration:
  • January 26, 2015 "Early Bird" registration deadline
  • Click here for more information and to register.
Mike Purdy's Public Contracting Blog
© 2014 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Wednesday, November 12, 2014

New California Law Unifies Approach to Design-Build

On September 30, 2014, California Governor Jerry Brown signed SB 785, clarifying and consolidating various Design-Build laws for public construction contracts throughout the state.

Use by state and local agencies:  Specifically, the new law provides for uniform Design-Build processes for certain state agencies, cities, counties, and other local contracting districts for projects over $1 million. The law defines a number of common terms, and outlines a standard Design-Build procurement process that includes either selection based on a low bid or a best value approach.  Click here for the legislative analysis of the bill that provides insight into the rationale for SB 785.

Who supported and opposed the bill?  The bill was supported by the AGC of California, some public owners, and the Western Pacific Region of the Design-Build Institute of America. It was opposed by some non-union contractor and subcontractor trade associations.
 
What is Design-Build? Design-Build is a project delivery method that places design and construction services under one contract with a single point of responsibility. Its advantages include reduced project costs, expedited project completion, and better quality due to the integration of design and construction through one firm.  The Design-Build Institute of America (DBIA) has written a Design-Build Done Right Primer that explains key concepts of this project delivery method.

Design-Build nationwide: Rules for use of Design-Build vary from state to state. The Design-Build Institute of America has published a 2013 State Statute Report outlining Design-Build laws in various states.

Managing Design-Build contracts:   Design-Build can be an effective tool for some projects, but it is very important that a public agency selects the right Design-Build partner for the project.  Here are some key guidelines related to the selection process:

  • Think through the selection process carefully up front, including evaluating likely proposers and how the process and point allocation may impact the end result. 
  • Based on the particular project, evaluate the appropriate allocation of points between qualifications/technical merit and price. 
  • Don’t change the selection process mid-stream through the procurement. This can lead to protests and delays for the project. 
  • If the agency does not have personnel with specific Design-Build experience, obtain the services of a qualified consultant to guide the agency though the project.
Mike Purdy's Public Contracting Blog
© 2014 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Tuesday, October 21, 2014

Applicants Sought for Washington's Project Review Committee

The Capital Projects Advisory Review Board (CPARB) is seeking letters of interest from individuals knowledgeable in the use of GC/CM and Design-Build to serve a 3-year term on its Project Review Committee (PRC). 

Open seats:  The following open seats will be filled by CPARB at its meeting on November 13, 2014:
  • 2 Owner - Higher Education
  • 1 Owner - School Districts
  • 1 Owner - Cities
  • 1 Owner - Counties
  • 1 Design Industry - Engineer
  • 1 Construction Manager
  • 2 Specialty Subcontractor
  • 2 Minority/Women Owned Business
Function of the PRC:  The Project Review Committee reviews applications from public agencies in Washington state interested in using either GC/CM or Design-Build for specific projects.  The PRC also certifies experienced public agencies, granting them authority to use these alternative project delivery methods without seeking PRC approval for each project. 

PRC meetings:  The PRC meets as often as bi-monthly to review project applications and hear applicant public agencies present their reasons for wanting to use GC/CM or Design-Build. 

To apply:  Individuals interested in serving on the PRC should submit a short letter (that will be posted on CPARB's website) by 5:00 pm on November 1, 2014 to Danelle Bessett at danelle.bessett@des.wa.gov.  The letter should include the following information:
  • Your name, title, and company or public agency name
  • Work address, email address, and best contact phone number
  • Short paragraph which highlights your skills, background or special knowledge for the PRC
  • Three references with contact information
Additional information:

Mike Purdy's Public Contracting Blog
© 2014 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Wednesday, July 9, 2014

Annual Design-Build Conference & Expo

Annual Design-Build Conference & Expo:  More public agencies across the country are beginning to use Design-Build as a project delivery method instead of the traditional Design-Bid-Build (or low bid).  Another model that is growing in popularity with public agencies is the use of Construction Manager at Risk.  Laws differ by state as to what forms of alternative delivery are permitted. 

When:  October 6-8, 2014 

Where:  Dallas, Texas 

Sponsored by: Design-Build Institute of America 

Information and registration:  Click here.
Mike Purdy's Public Contracting Blog
© 2014 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Tuesday, February 11, 2014

3 Upcoming Training Opportunities (Apprenticeship, Public Procurement, and BIM)

1.  Benefits of Apprenticeship for Contractors

When:  February 18, 2014 (3:00 p.m. to 5:00 p.m.) 

Where:  Everett, WA (Snohomish County Admin East Building, 3000 Rockefeller Ave)

Cost:  Free

Agenda: Informational session for contractors to learn about the benefits of apprenticeships offered through various state approved apprenticeship training programs including NW Laborers, NW Washington Electrical Industry JATC, and Construction Industry Training Council (CITC), and how apprentices through these programs can meet apprenticeship requirements for Snohomish County public works construction projects. In addition to representatives of these three programs, a representative from the Department of Lab or and Industries will also speak.

Sponsored by:  Snohomish County 

Information and registration:  Contact Jennifer Koontz at (425) 388-3344 or by email at jennifer.koontz@snoco.org.

*********************************************


2.  Introduction to Public Procurement

When:  March 5 - 7 2014 (8:00 a.m. to 5:00 p.m.) 

Where:  Everett, WA (Community Transit, 2312 West Casino Road) 

Cost:  
  • $660 for NIGP members
  • $860 for non-NIGP members 
Agenda:  
  • Day 1
  • Pre-test
  • History and Value
  • Private and Public Purchasing Organizations
  • Differences
  • Similarities
  • Purchasing Cycle
  • Day 2
  • Legal Issues
  • Ethics/Professionalism
  • Contract Administration
  • Organizational Structure
  • Roles
  • Centralized vs. Decentralized
  • Day 3
  • Planning
  • Specifications
  • Market Conditions
  • Socio-Economic Factors
  • Technology
  • Federal
  • Post-Test 
Sponsored by:  NIGP, Washington State Chapter 

Information and registration:  Click here. 

********************************************* 

 3.  Building Information Modeling (BIM): New Technology in Construction

When:  March 26, 2014 (1:00 p.m. to 5:00 p.m.) 

Where:  Seattle, WA (City University, 521 Wall Street) 

Cost:  
  • $295
  • $245 for Government Employees
  • Other rates also available 
Agenda:  
  • Introduction: Why BIM - Why Now? (Brendan J. Peters, Perkins Coie LLP)
  • The Past and Future of BIM (Dennis Neeley, Neeley Consulting)
  • The Legal Side of BIM (Brendan J. Peters, Perkins Coie LLP)
  • Managing BIM and the BIM Execution Plan (Christopher Hubbard, Quarry Group)
  • BIM from the Owner's Contractor's and Design Professional's Perspective (Andrew L. Greene, Perkins Coie LLP; David de Yarza, BNBuilders; James Hansen, Bethel School District; Jason Limp, BNBuilders, Jay Martin, Miller Hull)
  • BIM Coordination and Integrated Project Delivery (IPD) (Tim Luke, Basepin; Jim Stoner, Hainline & Associates)
  • BIM and Dispute Resolution (Christopher Nutter, Navigant Consulting) 
Sponsored by:  The Seminar Group 

Information and registration:  Click here.
Mike Purdy's Public Contracting Blog
© 2014 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Sunday, January 26, 2014

More Public Contracting Bills Introduced in Washington Legislature

In addition to the bills I commented on in my previous blog from January 21, 2014, the following additional bills impacting public contracting in the State of Washington have been introduced to the Legislature:

Exempt Proposals from Public Records Disclosure:  A bill (House Bill 2578) introduced to the Washington State Legislature would exempt from public records disclosure the proposals submitted by contractors for alternative public works delivery methods (Design-Build, GC/CM, and Job Order Contracting) and related evaluation documents until after a contract is executed or the selection process is terminated. 

Expand Prevailing Wages to Public-Private Partnerships:  Substitute House Bill 1025S would create a new definition of a "subsidized public works" project and would require that prevailing wages be paid on such projects.  Similar bills have been introduced in past years, but have not been successful.  Adoption of this bill would have the impact of limiting the number of public-private partnership projects constructed.  See my previous blog on legislation introduced in earlier years. 

Expand Apprenticeship Utilization Requirements:  House Bill 2526 would establish penalties for contractors failing to comply with the apprenticeship utilization requirements of RCW 39.04.320 for public works projects of the State Department of Enterprise Services, the State Department of Transportation, institutions of higher education, and all school districts.  The bill would also significantly expand requirements for use of apprentices on all public works projects of the state and all municipalities.  Here is a summary of the provisions of this bill:
  • Debarment:  HB 2526 would add to the list of reasons for contractor debarment the failure of the contractor to comply with the apprenticeship utilization percentages required by RCW 39.04.320.
  • Bidder Responsibility:  HB 2526 would also add to the list of mandatory bidder responsibility criteria in RCW 39.04.350 the failure of the contractor to meet apprenticeship percentage utilization requirements under RCW 39.04.320.
  • State Monitoring of Compliance:  The State Department of Enterprise Services would be required to maintain on its website a list of contractors that failed to meet apprenticeship percentage utilization requirements on public works projects.
  • Bid Preference for Contractors with Apprenticeship Programs: HB 2526 would provide a 5% bid preference to be used in bid evaluation for contractors with a registered apprenticeship training program approved by the Department of Labor and Industries for trades to be used on the public works project.
  • Expand Apprenticeship Utilization Requirements for all Public Agencies: HB 2526 would require that "the bidder must be a party to an apprenticeship agreement for each trade it is employing that has a registered apprenticeship training program" if the "bidder will employ more than one trade on the public work."  This provision appears to have the impact of requiring apprentice utilization for all municipalities, and not just those agencies named in RCW 39.04.320.
Permit Electronic Public Works Bidding for State Agencies:  Substitute House Bill 1841 would permit state agencies to conduct competitive bidding for public works projects electronically or accept electronic signatures as part of the bidding process.

Permit Fire Districts to Perform Public Works Without Bidding:  House Bill 2266 would permit a fire department or regional fire authority to "use fire service personnel, either employed or volunteer, to perform" public works projects less than $20,000 without obtaining competitive bids.
Mike Purdy's Public Contracting Blog
© 2014 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Thursday, October 31, 2013

Webinar: Communication Between the Owner and Design-Builder

Design-Build is gaining increasing popularity as a project delivery method for public construction projects.  

Webinar date/time:  November 12, 2013 (10:30 a.m. to 12:00 p.m. - Pacific Time)

Robynne Parkinson
Speaker:  Robynne Parkinson, JD, DBIA.  Robynne is one of the most knowledgeable Design-Build experts in the country, and is a dynamic and informative speaker. 

Cost: $50 

Agenda:  Robynne will discuss the communication between the owner and the Design-Builder, the single most important and most ignored tool between all parties.  She will also explain how the DBIA Contract Documents help to promote communication and make your project a success.  She will also provide updates on recent case law and legislation and their effect on the industry. 

Information and registration.  Click here for more information and to register for this webinar. 

Differing state laws:  State laws differ on whether and how much Design-Build is permitted.  In Washington state, Design-Build is regulated by RCW 39.10.  Earlier this year, North Carolina adopted a comprehensive Design-Build law (click here for information about training in NC).
Mike Purdy's Public Contracting Blog
© 2013 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Wednesday, October 30, 2013

Design-Build Conference

2014 Design-Build Conferences for Water Wastewater and Transportation

When:
  • March 17-19, 2014 - Water Wastewater
  • March 19-21, 2014 - Transportation
Where:  San Jose, CA (San Jose Convention Center)

Sponsored by:  DBIA (Design-Build Institute of America)

Information and registration:   Click here.

Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Monday, October 7, 2013

Subcontractors List Not Required on Alternative Public Works Projects

In Washington state, the Legislature has gone on record declaring that the practice of "bid shopping" is against public policy. 
Bid shopping occurs when a contractor seeks to pressure a subcontractor to lower their price below another price the contractor has already received, since a lower overall price increases the chance of the contractor being the low bidder.
When is the Subcontractors List required?  Due to the different nature of contractor selection and bidding on what are known as alternative public works projects (those not solicited through the traditional or Design-Bid-Build method but through methods authorized in Chapter 39.10 RCW), the subcontractors list requirements of state law do not apply on alternative public works.  

What does state law require?  RCW 39.30.060 requires, for projects estimated to cost $1 million or more, that the prime bidder submit a list of subcontractors (for electrical, plumbing, and HVAC) with the bid (or within an hour of the bid submittal deadline).   Here's the relevant language:
Every invitation to bid on a prime contract that is expected to cost one million dollars or more for the construction, alteration, or repair of any public building or public work of the state or a state agency or municipality as defined under RCW 39.04.010 or an institution of higher education as defined under RCW 28B.10.016 shall require each prime contract bidder to submit as part of the bid, or within one hour after the published bid submittal time, the names of the subcontractors with whom the bidder, if awarded the contract, will subcontract for performance of the work of: HVAC (heating, ventilation, and air conditioning); plumbing as described in chapter 18.106 RCW; and electrical as described in chapter 19.28 RCW, or to name itself for the work."

Design-Build:  Under Design-Build, public agencies do not issue an "invitation to bid" as noted in the subcontractor list law cited above, but issue either a Request for Proposals or a Request for Qualifications, in which the Design-Builder is selected based on qualifications and cost or price related factors. Under legislation approved in 2013 by the Washington State Legislature, price may now be negotiated with the chosen Design-Builder once the design has progressed to a point where the price may be determined.  RCW 39.30.060, the subcontractors list law, was written to address Design-Bid-Build projects.  Under Design-Build, subcontractors are generally not even identified at the time a contractor submits their qualifications to the public agency, making submittal of the subcontractors list not possible.

GC/CM:  Like Design-Build, the GC/CM is not selected based on an "invitation to bid," but through a Request for Proposals process.  When the GC/CM is selected, subcontractors have not been identified as RCW 39.10.380 requires that the GC/CM competitively bid all subcontract work after the construction cost has been negotiated.  The subcontractors list law requires the prime contract bidder to submit the list with their bid, but with the GC/CM process, subcontractors submit bids to the GC/CM after the GC/CM has already been selected and has executed a contract with the public agency.

Job Order Contracting:  RCW 39.10.430 (6) is more explicit than the provisions for Design-Build or GC/CM and states that "the requirements of RCW 39.30.060 [subcontractors list] do not apply to requests for proposals for job order contracts."

Legislative changes:  For clarity, chapter 39.10 should be amended to explicitly exempt Design-Build and GC/CM projects from the requirements of RCW 39.30.060.  They are very different project delivery methods and the requirements for the subcontractors list simply do not apply to these methods of selection.
Mike Purdy's Public Contracting Blog
© 2013 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Monday, September 30, 2013

2013 Design-Build Conference

2013 Design-Build Conference & Expo 


When:  November 4-6, 2013

Where:  Las Vegas, Nevada

Sponsored by:  Design Build Institute of America

Information and Registration:  Click here.

Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Monday, August 26, 2013

Training for Public Agencies on Changes to Alternative Public Works Contracting

RCW 39.10 Since Reauthorization:  During the 2013 legislative session, the Washington State Legislature adopted changes to the alternative public works contracting statutes (Design-Build, GC/CM, and Job Order Contracting), and reauthorized these methods for another eight years.

When:  September 17, 2013 (9:00 a.m. to noon)

Where:  Seattle-Tacoma International Airport (The Conference Center, 17801 International Blvd.)

Cost:  Free.  Attendees must pay for parking.

Instructors:
  • Bob Maruska, CPARB Chair; Assistant Director of Engineering Design Services, Port of Seattle
  • Ed Kommers, CPARB Vice Chair; Executive Director, Mechanical Contractors Association of Western Washington
  • Dan Absher, CPARB Member; President, Absher Construction
  • Eric Smith, Member and Past Chair Project Review Committee, Director, Capital Projects, University of Washington
Information and registration:  Click here.  Limited to 200 attendees so sign up early.

Questions:  Contact Bob Marsuska at (206) 787-3146 or by email at maruska.b@portseattle.org.

Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Tuesday, August 20, 2013

Obtaining Qualified Contractors on Public Construction Projects

Traditionally, public agencies have awarded public construction projects to the low bidder.  In theory, this ensures that the public pays the lowest possible cost for such work.  However, the low bid doesn't always result in the lowest price at the end of the project, nor does it ensure that the low bidder is capable of performing quality work.

Agencies seek more flexibility in award:  In response to concerns about low bidders not performing well and arguing for change orders that will increase the contract cost, public agencies have increasingly been developing alternative methods for awarding public construction projects.  These alternative methods come with their own set of challenges and may actually cost more money, depending on how the selection process is implemented.

Design-Bid-Build:  The following three approaches, based on contractors bidding a fully designed scope of work, are sometimes used by public agencies for ensuring that the contractor selected is qualified to perform the work:

Prequalification:  Under this scenario, contractors must be prequalified and meet certain criteria before being permitted to bid on a project.  Some public agencies are not authorized to prequalify contractors.  For those that are authorized to prequalify contractors, it is important that the criteria used to evaluate qualifications be clear, objective, and not overly restrictive of the bidding pool of contractors.

Bidder Responsibility:   In many cases, bidder responsibility criteria are the same as the prequalification criteria.  The only difference is that all contractors may bid a project rather than just prequalified contractors.  The low bidder must then demonstrate they meet the bidder responsibility criteria.  Prequalification analysis occurs prior to bidding, while bidder responsibility evaluation occurs after bidding, but prior to award.  Like prequalification, bidder responsibility inserts an element of subjectivity into the award process.

Best Value:  A best value selection process moves away from price as the only basis for identifying the successful contractor and instead begins to looks more like a Request for Proposals process, where various evaluation criteria are identified, including price.  Not all public agencies are authorized to conduct a best value selection process, and the process is often criticized for its subjectivity with the result that the public agency may contract with the firm who does not have the lowest bid.

Alternative Project Delivery Methods:  The following two alternative project delivery methods are gaining in popularity with public agencies.  Unlike the models used under a Design-Bid-Build approach, the design is not complete when the contractor is selected under the following two alternative methods:

Construction Manager at Risk:  This process is known by many different names (CM at Risk, CMAR, GC/CM (General Contractor/Construction Manager), and CM/GC (Construction Manager/General Contractor)).  Not all public agencies are authorized to use this process which involves selection of a contractor early in the design process, through a Request for Proposals process, partially based on qualifications and partially based on limited pricing (fee and general conditions work).  The selected contractor then works with the designer in providing various preconstruction services (cost estimating, scheduling, constructability reviews, value engineering, etc.) before the construction cost is negotiated between the parties when the design is sufficiently completed. 

Design-Build:  Under this project delivery method, the public agency uses a Request for Proposals process to select one firm to both design and build the project, eliminating or reducing conflicts between the designer and contractor.  The price is either part of the selection process (which brings with it many of the problems of the traditional low bid award), or the price is negotiated between the partieis when the design is sufficiently complete.  

Indefinite Delivery/Indefinite Quantity:  Also known as IDIQ, this method of public construction is basically an on-call process, in which undefined work is bid ahead of time and one contractor is selected, sometimes based on price alone and sometimes based on price and qualifications.  There are two major forms that IDIQ public construction contracts take:

Job Order Contracting:  Under Job Order Contracting, a contractor is selected partially based on qualifications and partially based on their markup percentage for serving as the general contractor for undefined work that will be assigned as the needs arise.  Establishing the cost of a specific project is typically based on an agreed upon unit price book.  Nevertheless, the contractor and agency must still negotiate the specific cost of work to ensure that units and quantities used in the estimate are appropriate.  Job Order Contracting is sometimes criticized for being more expensive than the traditional low bid process, but it is a more efficient process for ensuring that work is performed in a timely manner.

On-Call Contracting:  On-call construction contracting differs from Job Order Contracting in the selection process in that specific units of work are bid as part of the selection process (rather than relying upon a unit price book).  While the contractor in Job Order Contracting may be required to subcontract out major portions of the work, under on-call contracting, the contractor often performs all or most of the work themselves.  On-Call contracting is an effective tool for minimizing multiple invitations to bid for what are typically smaller dollar amount projects.  

General comments:
  • How much are bidder qualifications worth?  In most of the methods described above, there is some level of subjectivity involved in the selection process as a public agency evaluates and scores bidders based on qualifications and experience.  The result is that the low bidder may not end up being the selected bidder, or the price may be negotiated.  
  • Maintaining fairness and transparency:  In selecting contractors based on factors other than the low price, it is important that the process established be fair and transparent, and that the qualifications and proposals of contractors be rated as objectively as possible.  The low bid process was originally established to avoid public agencies showing favoritism to certain contractors.  Public agencies are now recognizing that the low bidder isn't always the best option for the public.  But in expanding the scope of selection methodologies, there is the risk of shifting back into an environment of favoritism to certain contractors.  These alternative tools must be managed carefully and thoughtfully.
  • Not all agencies authorized to use all methods:  Not all public agencies are authorized to use some of the selection methods outlined here.  State laws differ.  In addition, if there are federal funds involved with a project, public agencies need to work closely with the federal department granting the money to ensure that the selection process complies with federal regulations.
Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Wednesday, May 29, 2013

Choosing the Right Construction Project Delivery Method

Traditionally, public agencies have awarded public works construction projects using what is often referred to as "Design-Bid-Build," in which the award is based on the low responsive bid submitted by a responsible bidder.  

Alternative Project Delivery Methods:  Increasingly, alternative project delivery methods that have been used in the private sector are being used in the public sector.  Most prominent among the alternative methods are Design-Build and Construction Manager at Risk (also known as GC/CM, CM/GC, CMAR, etc.).  Regulations differ from state to state on how these methods work or if they are even authorized.  In Washington State, Design Build and GC/CM (General Contractor/Construction Manager) are authorized and their permitted use described in Chapter 39.10 RCW.

Analysis of 4 Project Delivery Methods:  I recently ran across an excellent ten-page, easy-to-read article from the Fall 2004 issue of Popular Government, based in North Carolina, entitled "Public Construction Contracting: Choosing the Right Project-Delivery Method" by Valerie Rose Riecke.  The article analyzes the following four project delivery methods:
  • Design-Bid-Build using separate (or multiple) prime bidding
  • Design-Bid-Build using a single prime bidding
  • Construction Manager at Risk
  • Design-Build
Construction industry goals:  The article presents the findings of a questionnaire distributed to construction industry experts addressing the advantages and disadvantages of each of these four project delivery methods based on the following four construction contracting industry goals:
  • Controlling project costs
  • Meeting or accelerating the schedule
  • Ensuring a quality product
  • Decreasing the administrative burden.
Comment:  The article, while dated, does a good job of explaining the perceived advantages and disadvantages of each of the four project delivery methods.  Of the four methods identified, the Design-Bid-Build using separate (or multiple) prime bidding is not used frequently, and rated much lower in most of the questionnaire results. There are only a handful of states that even permit the use of this method.

Previous Blog Post:  On April 25, 2012, I published a blog post summarizing a variety of project delivery methods and the advantages and disadvantages of each.  Click here to read the posting.
Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Tuesday, May 7, 2013

New Public Procurement Laws Approved in 2013 Legislative Session

The Washington State Legislature has approved the following laws impacting public procurement and contracting:

Alternative public works procedures:   Substitute House Bill 1466 reauthorizes the alternative public works contracting procedures of Design-Build, GC/CM, and Job Order Contracting for another eight years.  There were a number of relatively minor changes to the law that I will blog about later.

No retainage on federally funded transportation projects:  Substitute House Bill 1420 fixes a technical problem from previous legislation that was necessary to comply with U.S. Department of Transportation regulations regarding retainage.  While much of the bill represents an improvement, it does have its flaws as I noted in a previous blog entry.
  • State agencies protected under payment bond:  Under SHB 1420, no retainage may be withheld on any project funded in whole or in part with federal transportation funds.  Instead, the protection normally afforded by retainage for subcontractors, suppliers, workers, and three state agencies (Revenue, Employment Security, and Labor and Industries) for taxes and premiums must come from the payment bond instead.
  • Notify state of acceptance:  Even though no retainage may be withheld on these projects, the public agency must nevertheless notify the Departments of Revenue, Employment Security, and Labor and Industries of final acceptance for such contracts over $35,000.
  • Affidavits prior to final acceptance:  For these federally funded transportation projects, the Affidavits of Wages Paid for the contractor and all subcontractors must be submitted prior to final acceptance by the public agency.
  • "Shall" to "must":  There are numerous changes throughout the bill modifying "shall" to "must." 
Evaluating the low bid for purchases before taxes: Under Engrossed Substitute Senate Bill 5110, a local government authorized to impose sales and business and occupation taxes may award a contract for supplies, materials, or equipment to a bidder submitting the lowest bid as calculated before the application of local sales and business and occupation taxes.

Water-Sewer Districts - Payment and Performance Bonds:  Senate Bill 5186 will permit Water-Sewer Districts to require that payment and performance bonds on its public works contracts name the water-sewer district as the protected party (obligee) rather than the state.  Prior to passage of this bill, all payment and performance bonds for a Water-Sewer District were technically required to name the state as the obligee.  Up to this point, only cities and towns have had the ability to have themselves and not the state named as the obligee.  While this bill fixes the problem for Water-Sewer Districts, there are a host of other types of public agencies that, by practice, require payment and performance bonds to name the agency as the obligee, notwithstanding the language of RCW 39.08.030.

School Districts - Bid thresholds:  Engrossed Substituted House Bill 1633 increases thresholds for public bidding and performing public works with school district personnel.  The dollar threshold above which bidding for a public work is required will be increased from $50,000 to $100,000.  The dollar threshold below which a school district may use its own staff to perform a public work is increased from $40,000 to $75,000. 

WSDOT - Use of Job Order Contracting:  Under the provisions of  House Bill 1768, the Washington State Department of Transportation (WSDOT) will be added to the list of public agencies authorized to use Job Order Contracting as described in Chapter 39.10 RCW.  With the passage of the bill, WSDOT will be able to use Job Order Contracting for "the administration of building improvement, replacement, and renovation projects only."

Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Tuesday, April 30, 2013

What is the Appropriate Weighting of Price in the Selection Process?

The allocation of evaluation criteria points between qualifications and price in government issued Requests for Proposals (RFPs) is sometimes a hotly disputed issue.  

California dispute:  The California High-Speed Rail Authority, which is planning to award a Design Build contract for the construction of the first 28 miles of track for the 200 miles per hour train, finds itself embroiled in a controversy over its evaluation and selection process for a contractor.

Original selection process:  The original two step selection process, approved by the Authority's board, called for shortlisting only the top three firms from a Request for Qualifications (RFQ) based on their technical approach and qualifications to build the project, estimated at $1.2 billion.  From there, an RFP was to be issued only to the finalist firms and a selection would be based on the combination of price and technical scores.  However, the Authority changed the process and issued the RFP to all five contractors who had responded to the RFQ.  

Weighting price and qualifications:  The RFP issued by the Authority assigned 30 points to the technical evaluation from the RFQ, and 70 points to the price in response to the RFP.  On such a technical and complex Design-Build project, the high number points assigned to price has drawn criticism.  It turns the Design-Build process back into almost a low bid scenario.  The best practice for Design-Build projects is to weight qualifications higher than price.

Selection results:  It turns out that the firm ranked lowest for qualifications and technical approach had the lowest price.  By adding the technical and price points together, they were the highest ranked firm.  Without the earlier change opening the RFP process to all five firms, the joint venture of Tutor Perini-Zachry-Parsons would not have moved to the RFP stage.  Tutor Perini ranked dead last on the technical evaluation with only 20.55 points, compared with the highest ranked firm that received 27.71 points.  However, Tutor Perini came in with the lowest price of $985 million, giving them the full 70 points for price, and the highest number of points overall for both the technical and price components.  Below is a chart with the scores for all the firms.



Lessons learned:  While the California High-Speed Rail Authority project is a Design-Build process, it illustrates the importance of developing a good evaluation process for all RFQs and RFPs for services, consulting, and alternative methods of construction (Design-Build and Construction Manager at Risk).
  • Think through the selection process carefully up front, including evaluating likely proposers and how the process and point allocation may impact the end result.
  • Based on the particular procurement, evaluate the appropriate allocation of points between qualifications/technical merit and price.  Refer to a previous blog posting I've written on some principles to consider in making this decision.
  • Don't change the selection process mid-stream through the procurement.  This can lead to protests and delays for the project.

Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Sunday, April 21, 2013

State Seeks Members for Project Review Committee

The Washington State Capital Projects Advisory Review Board (CPARB) is seeking letters of interest from individuals knowledgeable in the use of Design-Build and GC/CM (General Contractor/Construction Manager) procedures, to serve three-year terms on its Project Review Committee (PRC).

What is the PRC?  The PRC reviews applications of public agencies interested in being approved to use either Design-Build or GC/CM on a public works project.  Click here for more information about the PRC.

PRC openings by industry sector:  

Open Seats:  
  • 1 Constructions Trade Labor
  • 1 Private Sector
Expiring July 1, 2013:  
  • 1 Design Industry - Architect
  • 3 General Contractors
  • 1 Specialty Subcontractor
  • 1 Construction Manager
More information:  
  • Click here to read CPARB's recruitment notice.  Letters of interest are due by April 30, 2013.  CPARB will vote on selections at its May 9, 2013 meeting.

Emergency PRC meeting:  The PRC will meet on April 25, 2013 to consider applications from Snohomish County and Sound Transit.  The next regularly scheduled meeting of the PRC is for May 23, 2013.
Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Sunday, April 14, 2013

Upcoming Training, Networking, and Legislative Events

Bid Schedules and Bid Forms:  Free training sponsored by MRSC and APWA's Contract Administration Subcommittee.  In four locations around Washington state: Renton (May 2, 2013), Yakima (May 9, 2013), Camas (May 16, 2013), Everett (May 23, 2013).  10:00 a.m. to 3:00 p.m.  The workshop will explore the varying methods used by public agencies in developing bid schedules and bid forms, and determining the basis of award on public works construction projects.  Click here for more information and registration.

New Design-Build Legislation in Washington State:  Whether you're a public agency thinking about using Design-Build, or a contractor working in or interested in this market, you'll benefit from this timely update from a panel of experts involved in drafting and negotiating the changes in the Design-Build law - RCW 39.10 (Robynne Parkinson, Eric Smith, Bob Maruska, and Dan Absher).  DBIA Seattle breakfast meeting.  May 8, 2013 from 7:15 a.m. to 9:00 a.m. at the Harbor Club (801 Second Avenue). Cost: $65 for DBIA members; $90 for non-DBIA members.  Click here for more information and registration.
  
Business Opportunities Workshop:  Designed for consultants interested in doing business with Seattle Public Utilities.  Thursday, April 18, 2013, 2:30 p.m. to 5:00 p.m., Seattle Municipal Tower (Rooms 4050/4060).  Information about projects and upcoming consultant contract opportunities to do business with SPU.  Network with other consultants.  More information and questions, contact Vicky Schiantarelli at (206) 684-7821 or by email at vicky.schiantarelli@seattle.gov.  Space is limited.  Click here to register for this free event.

Capital Projects Advisory Review Board (CPARB):  May 9, 2013 from 9:00 a.m. to noon in Olympia.  Open to the public. Click here for more information about CPARB.  The agenda for the meeting will be posted soon.

Blue Book Network Showcase:  Free networking and educational event for the design and construction community.  May 9, 2013 (3:00 p.m. to 7:00 p.m.) in Seattle, Washington at the Bell Harbor International Conference Center.  Click here for more information and registration.

GC/CM Training Workshop:   Whether you're a public agency interested in exploring use of GC/CM or a contractor or designer, this two day training event will outline the basics and best practices of GC/CM (General Contractor/Construction Manager) as authorized by RCW 39.10.  May 30-31, 2013 in Seattle at the AGC Building.  8:00 a.m. to 5:00 p.m.  Cost: $350.  Sponsored by AGC Education Foundation, University of Washington, and Mechanical Contractors Association of Washington.  Click here for more information and registration.

Construction Owners Association of America (COAA) - Washington State Chapter Workshop:   June 5, 2013.  9:00 a.m. to noon at the University of Washington's Waterfront Activities Center (3900 Montlake Blvd.).  Presentations on a) Coyote Ridge LEED Gold Prison Performance Comparison with David Jensen and b) COBie (Construction Operations Building Information Exchange), BIM, GIS and other Digital Adventures at the University of Washington with Eric Smith.  Cost: $30 for COAA members; $35 for non-COAA members.  Click here for more information and to register.

City of Seattle Reverse Vendor Trade Show:  Companies interested in doing business with the City of Seattle can learn about upcoming solicitations, sustainable purchasing, and business-to-business opportunities for Goods and Services, Consulting, and Construction.  July 30, 2013, 10:00 a.m. to 2:00 p.m. at Seattle Center Fisher Pavilion (305 Harrison Street).    Click here for more information and registration.

Institute for Supply Management (ISM) Conference:  98th Annual International Supply Management Conference in Dallas/Ft. Worth, Texas.  April 28-May 1, 2013. Keynote speaker: Condoleezza Rice.  Click here for more information.
Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Wednesday, March 27, 2013

Design-Build Certification Workshop

In 2012, six projects were given approval by Washington State's Project Review Committee to use Design-Build as the project delivery method.  That represents a significant increase from the two projects that were approved in 2011.  As more public agencies turn to alternative public works contracting methods (Design-Build and GC/CM) for larger projects, it is important that public agencies and the contracting community be knowledgeable about this tool.  In Washington State, the Design-Build law for public agencies is described in RCW 39.10.

Training:  DBIA (Design-Build Institute of America) is sponsoring a week long workshop on Design-Build.  It is part of the process for obtaining certification by DBIA.

When:  April 29, 2013 to May 3, 2013 (7:15 a.m. to 5:00 p.m.)

Where:  Portland, Oregon (111 SW 5th Avenue)

Agenda by day:
  • Fundamentals of Project Delivery
  • Principles of Design-Build Project Delivery
  • Design-Build Contracts & Risk Management
  • Post Award Design-Build
  • Certification Exam Prep
Cost:
  • $2,150 for DBIA members
  • $2,750 for non DBIA members
Information and registration:  Click here.
Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com