Global Standards for Public Procurement Developed by NIGP

NIGP - The Institute for Public Procurement, has developed a series of position papers or standards addressing a variety of key issues in public procurement. 

Global Standards issued to date:  The following are the subjects for the "Global Standards of Public Procurement Practice" that have been adopted to date:
  1. Strategic Planning
  2. Performance Measurement
  3. Performance Management
  4. Performance Metrics
  5. Cooperative Procurement
  6. Transparency
  7. Risk Management
  8. Developing a Procurement Policy Manual
  9. Ethical Procurement
  10. Performance Based Contracting
  11. Sustainable Procurement
  12. Spend Analysis
  13. A Lease-Purchase Decision
  14. Specifications
  15. Developing Evaluation Criteria
  16. Outsourcing
  17. Technology in Public Procurement
  18. Evaluation Process
  19. Supplier Relationship Management 
  20. Qualifications-Based Selection for Architectural and Engineering Services (QBS)
  21. Public-Private Partnerships 
More information:  To read the actual standards developed for each of the above-listed items, click here to visit NIGP's website.  Select "Public Procurement Practices & Principles" on the left side of the page and then click on any of the specific statements you wish to read.
Mike Purdy's Public Contracting Blog
© 2014 by Michael E. Purdy Associates, LLC
http://PublicContracting.blogspot.com

Wednesday, July 24, 2013

When is the Price Not Right?

Most states and the federal government have adopted what is known as "Qualifications Based Selection" (QBS) for contracting with architects, engineers, and related professions.  Under QBS, a public agency may not use price as one of the evaluation criteria, but must select the most highly qualified firm and then negotiate the price with that firm.

Questionable QBS practices:  Some public agencies have pushed the limits of what is acceptable under QBS.  The following questionable selection strategies are sometimes used by agencies attempting to obtain the price for professional services prior to selection.
  • The envelope please:  Under this practice, an agency asks for each firm's proposed price in a sealed envelope which is submitted at the same time as the statement of qualifications.  The agency's Request for Qualifications (RFQ) will typically state that the envelope will not be opened until after a selection based on qualifications has been made.  The firm's proposed price in the sealed envelope then serves as the basis for beginning negotiations for a mutually acceptable contract amount.  Architects and engineers often question this practice and are concerned that an agency may open the envelope early, and such information will be used in making the selection decision.
  • Hours only:  Sometimes an RFQ will request that responding firms submit an estimate of the hours or level of effort that will be required for the contract.  However, because the range of typical hourly rates may be common knowledge, an agency can easily calculate which firm has the highest and lowest overall price.  This would appear to violate the intent and requirements of QBS.
  • Rates only:  Under this questionable practice, an agency does not request a proposed total fee from responders, but only the fully loaded hourly rates for each employee or class of employees that will work on the project.  No hours are requested under this dubious practice.  Because the intent of QBS is that public agencies will make selection decisions based only on the qualifications of the firms, asking for hourly rates seems to cross the line away from selecting based on qualifications only, and into the price arena.  In other words, architects and engineers will argue that cost factors (as opposed to qualifications only) are, in fact, being used as part of the selection process, violating the intent and requirements of QBS.
  • Budget:  Some agencies ask in an RFQ or interview for respondents to comment on and demonstrate how they will meet the agency's specific dollar amount budget.  If the responses focus on the specific dollar amount available, the question may well step over the line of what is acceptable as part of QBS.  On the other hand, it is acceptable to ask respondents how they will control costs or what their record is in meeting budgets.  But providing the agency's specific budget amount and asking how firms will meet that budget begins to look like pre-negotiation and using price as a factor in the selection process.  In other words, one firm may indicate that the budget is not sufficient and may be rated lower, resulting in price being used as part of the selection process instead of just qualifications, as required by QBS.
Checklist for compliance:  
  • Federal law:  Review the architectural, engineering, and related professions included in QBS under the federal Brooks Act, which is applicable if your project includes any federal funding.
  • State law:  Review any state law requirements regarding QBS.  In Washington state, QBS is governed by RCW 39.80.
  • Local practices:  Examine your evaluation criteria and practices to ensure they are consistent with federal and state QBS requirements.
Mike Purdy's Public Contracting Blog 
© 2013 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Monday, May 7, 2012

Can Price be Used in Selecting Architects and Engineers?

In selecting a consultant to provide architectural and engineering services, can a public agency use the proposed price as part of the evaluation and selection process?  In most cases, the answer is "no."  

State Laws:  All but a handful of states have a Qualifications Based Selection (QBS) law.  Some of these state laws apply only to state agencies and not local governments, while others apply to both state and local agencies.  Click here for a state-by-state list of QBS laws. In Washington State, RCW 39.80 applies to state and local agencies and prohibits the use of price as a selection criterion.

Federal Laws:  At the federal level, federal contracts and state and local agency projects funded with federal money are governed by the 1972 federal QBS law, known as the Brooks Act.

What is QBS?  Under Qualifications Based Selection, the public agency is required to select the most qualified firm, without the cost or proposed price being requested or being included as an evaluation criterion.  The parties then enter into negotiations about the scope of work and cost.  In the event that negotiations are unsuccessful, the public agency may then enter into negotiations with the second most highly qualified firm.

What disciplines are covered by QBS?  Various state and federal laws define architectural and engineering services covered by QBS differently.  
  • Washington State:  In Washington state, RCW 39.80 covers four disciplines under QBS: architecture, engineering, landscape architecture, and land surveying. 
  • Federal Brooks Act:  The following is the list of disciplines covered under the Brook Act.  It is more expansive than the list of covered disciplines by Washington state law:
  • Licensing:  Professional services of an architectural or engineering nature, as defined by State law, if applicable, which are required to be performed or approved by a person licensed, registered, or certified to provide such services as described in this paragraph;
  • Related to Real Property:  Professional services of an architectural or engineering nature performed by contract that are associated with research, planning, development, design, construction, alteration, or repair of real property; and
  • Typically Performed by:  Such other professional services of an architectural or engineering nature, or incidental services, which members of the architectural and engineering professions (and individuals in their employ) may logically or justifiably perform, including studies, investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils engineering, drawing reviews, preparation of operation and maintenance manuals, and other related services.
  • Federal Departments:  Certain federal funding sources, such as the U.S. Department of Transportation [49 U.S.C § 5325(b)], augment the list of disciplines covered under the federal Brooks Act.
Practical tips:
  • State Law:  Review the requirements of your state law regarding Qualifications Based Selection and what disciplines are covered.
  • Federal Law:  If your project includes federal funds, the Brooks Act will apply.  The particular funding agency may have other requirements that expand the list of what is covered by QBS.
  • Select Based on Qualifications:  Ensure that your solicitation document, typically a Request for Qualifications, does not include price as an evaluation criterion.
  • Learn How to Negotiate:  Because most government agencies are typically more comfortable just accepting the low bid, obtain proper training in how to negotiate the cost of architectural and engineering work.
Resources:  The American Council of Engineering Companies (ACEC), a strong proponent of QBS laws, has a web page with some good resources describing the purpose and practice of QBS.  Click here to visit their QBS resource page.
Mike Purdy's Public Contracting Blog 
© 2012 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Sunday, October 23, 2011

May Agencies Contract with Other Agencies for Architectural and Engineering Services?

The Washington State Attorney General's office recently published a legal opinion on whether public agencies in the state can contract with other agencies to provide architectural and engineering services through the use of an interlocal agreement, but without complying with the selection provisions of RCW 39.80.020.

The Question:  Here's the specific question that was asked by State Senator Michael Baumgartner:
May a state or local agency or special district contract directly with another agency for architectural or engineering services, all as defined in RCW 39.80.020, without first complying with the procurement procedures specified in RCW 39.80?
The Answer:  The Attorney General's opinion states that public agencies must comply with RCW 39.80.020 when acquiring architectural and engineering services, and that "the Interlocal Cooperation Act, RCW 39.34, does not excuse compliance with those requirements, but does allow public agencies to join together in acquiring such services."

The Legal Opinion:  Rather than attempt to restate the Attorney General's reasoning, I suggest you read the opinion yourself if this subject applies to you.  The six page legal opinion refers back to a 1990 opinion on the subject that was more limited in scope.  The new opinion recognizes that there may be some statutes that "independently authorize an agency or special district to contract directly with another agency or special district for architectural or engineering services." 

Implications:  The legal opinion may have negative consequences for some public agencies who rely upon other agencies for providing architectural and engineering services through the use of an interlocal agreement.  Clearly, there are competing interests involved with this issue.  
  • Public Agency Interests:  Public agencies may find that the most efficient manner of acquiring some of these services is from another agency.  However, given the opinion from the Attorney General's office, this doesn't appear to be an option for agencies that do not have specific legislative authority. 
  • Consultant Interests:  Especially in this difficult economy, architects and engineers may view provision of these services by public agencies for other agencies as a limitation of their potential workload, and they will welcome the Attorney General's opinion.  
Resources:
Mike Purdy's Public Contracting Blog 
© 2011 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Monday, August 15, 2011

Free Webinar on Contracting for Architectural and Engineering Services

Webinar on Contracting for Architectural and Engineering (A/E) Services

When:  Tuesday, August 30, 2011 (10:00 a.m. to 11:00 a.m.)

Cost:  Free

Where:  Your computer


Panel:
5 Questions to be Addressed by Panel:
  1.  Do you feel that Qualifications Based Selection (QBS) for A/E consultants is a good business practice?
  2. What professional disciplines does QBS selection apply to and should it be used for certain non-A/E consultants?
  3. What are the advance notification provisions of Chapter 39.80 RCW and how have they been applied correctly and incorrectly?
  4. Do you feel that agencies select directly from their A/E consultant rosters more frequently than they should?
  5. What are some best practices for agencies to follow in their Requests for Qualifications, interviews, and contract negotiations?
More Information and Registration:  Click here.
Mike Purdy's Public Contracting Blog 
© 2011 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Tuesday, April 12, 2011

King County (WA) Announces New Online Roster Programs

On April 4, 2011, King County rolled out a new online system to manage their Architectural & Engineering Roster and Small Works Roster. Firms can now apply for and manage their membership in both rosters online. 

Less Than $300,000:  Both rosters which will be used for projects under $300,000. While King County will begin using the new system to solicit bids starting in June, firms can apply any time during the year.

Application Process:  To apply to the online roster, firms should be registered with the King County Online Vendor Registration (OVR) program. To register with the OVR system and apply to the rosters, visit the OVR account page.

More information:
Mike Purdy's Public Contracting Blog 
© 2011 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Monday, January 17, 2011

Selecting Consultants from a Roster

Many public agencies maintain rosters from which to select consultants, especially architects and engineers.  The purpose of the rosters is to streamline the selection process for agencies, while still ensuring a process that is fair and transparent to the consultant community.

Individual or Shared Rosters:  There are two basic ways in which rosters are maintained.  Many public agencies manage their own roster and advertise for statements of qualifications to be submitted on a regular basis.  Other public agencies collaborate and belong to rosters shared with other agencies, reducing the expenses involved in maintaining individual rosters, and making it easier for consultants to submit their qualifications.

Shared Rosters:  In the State of Washington, there are two well known joint roster programs.  One is sponsored by the Municipal Research and Services Center (MRSC) and the other by eCitygov.net which maintains a Shared Procurement Portal.  The rosters have slightly different operating philosophies, technologies, and expenses.  Check out their websites if you want to learn more about them.

Use of Rosters:  In making selections from a roster, it is important for public agencies to have established policies on how and when the roster will be used.  The following are a couple of issues to consider:
  • Dollar Threshold:  Agencies should decide by policy at what dollar amount it is acceptable to select a consultant from the roster, and when a separate advertisement must occur to solicit qualifications and/or proposals from consultants.
  • Notification to Firms on Roster:  Another important policy decision for public agencies to make in the management of rosters is how many firms should be notified of the consultant opportunity.  Agencies who notify all of the firms on the roster (or the applicable roster category) incur two risks.  First, especially in this market, they may find themselves inundated with submittals from consultants, all of which must then be evaluated.  Second, some very qualified firms may choose not to submit if they know that the notice has been sent to all of the firms on the roster.  Agencies should consider establishing a policy that enables staff to develop a short-list of qualified firms from the roster to solicit for any given need.
Selection of Architects and Engineers:  In the State of Washington, the selection of architects, engineers, landscape architects, and land surveyors is governed by RCW 39.80, which is a qualifications based selection process.  In other words, these professional services must be selected based on which firm is the most qualified, without using price as a selection criterion.  The contract amount is then negotiated with the most qualified firm.  RCW 39.80 requires public agencies to advertise their need for architectural and engineering services, either through an individual advertisement for a project, or through annual advertisement for soliciting qualifications for inclusion on a roster.

Practical Tip:  In developing a consultant roster program, check the state laws that relate to your specific type of agency (city, county, school district, port district, housing authority, etc.), any federal regulations that may apply to grants you receive, and your agency's own internal policies to determine how a roster program might work for your agency.

Training:  I have developed an all day training class on "Developing and Managing RFPs and RFQs" that I've taught a number of times now.  I will be teaching the class Arlington, Washington on February 2, 2011, and again on April 6, 2011 in Lacey, Washington.  For more information and to register, visit the website of Enduris, a public risk management pool, that is sponsoring the training.  The following is a high level outline of the content of the class:
  • Building the Public's Trust
  • Planning the Procurement
  • Standard Provisions and Concepts
  • Conflicts of Interest
  • Cost and Price Analysis
  • Advertising Issues
  • Pre-Submission Meeting
  • Receiving and Opening Proposals
  • Evaluation Committee
  • Evaluating Proposals and Qualifications
  • Managing Interviews
  • Recommending Award
  • Contract Negotiations
  • Developing Scopes of Work
Please contact me if you have any questions about the training.
Mike Purdy's Public Contracting Blog 
© 2011 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Sunday, September 19, 2010

The ABCs of IFBs, ITBs, RFPs, RFQs, and RFIs

It's a clever title for a blog entry, but I can't take credit for it.  It comes from Eileen R. Youens, who is Assistant Professor of Public Law and Government at the University of North Carolina School of Government.  Eileen is one of the most articulate and clear thinkers when it come to government procurement and contracting.   

She recently wrote a blog entry on the NC Local Government Law Blog entitled "The ABCs of IFBs, ITBs, RFPs, RFQs, and RFIs."  While much of her blog entry focuses on North Carolina state law and how it impacts public agencies in that state, she does a great job of laying out the distinctions between these different documents.

She writes as follows:
What's the difference between an IFB, and RFP, and an RFQ, and what are they anyway?  As I'll explain in more detail in this post, what name you give a solicitation document - the document you use to solicit bids or proposals - is not as important as the process you use to award the contract.

There are four main types of solicitation documents: (1) those used for bidding, where price is the primary factor; (2) those used to request proposals focusing on factors other than price; (3) those used to ask for someone's qualifications; and (4) those used to gather information from potential bidders or proposers before starting the bid or proposal process.
I encourage you to read her blog entry on the subject.  Regardless of what state you are in, it gives a clear perspective on generally when certain types of solicitation documents are appropriate.  Make sure you check your own state and local laws, as well as federal requirements if your project is funded with federal funds, to understand when it is appropriate to use different solicitation tools, and what the dollar threshold levels are.

Wednesday, August 11, 2010

Training: Contracting for Services in Washington State

Topic:  Contracting for Services in Washington State

Where and When (10:00 a.m. to 2:30 p.m.) - choose one location:
  • Everett (September 14, 2010)
  • Renton (September 16, 2010)
  • Camas (September 21, 2010)
  • Yakima (September 30, 2010)
Cost:  Free

Agenda:  
  • What's the difference between purchased services, personal services, and professional services?
  • What dollar thresholds apply for selection?
  • What laws apply to different types of contracts?
  • What advice do consultant give for how a public agency should structure and RFP or RFQ?

For more information and to register, click here.

Sunday, May 9, 2010

Study Supports Use of Qualifications-Based Selection for Design Professionals

According to a study developed at the request of the American Public Works Association (APWA) and the American Council of Engineering Companies (ACEC), Qualifications-Based Selection (QBS) of design professionals (architects and engineers) on public projects has a number of benefits.  

QBS is a system that requires the selection of the most qualified design firms, without using cost as a selection criterion.  The cost of the design is negotiated with the most qualified firm before a contract is executed.

Key findings from the June 2008 report include the following strengths of the using QBS:
  • Ensures Cost-Effectiveness
  • Results in Better Projects and Highly Satisfied Owners
  • Lowers Risk for Complex Projects
  • Encourages Innovation, Protects Intellectual Property
  • Takes Account of Emerging Societal Issues
  • Supports Owner Capacity Building
Federal projects require the use of QBS under the Brooks Act, and most states have adopted similar QBS requirements for non-federally funded public design projects.

In Washington State, chapter 39.80 RCW is a QBS requirement.
To read to entire 52 page report from APWA and ACEC, click here.

Monday, December 7, 2009

Qualifications and Price as Selection Criteria

In selecting a consultant, service provider, or contractor (under certain alternative public works contracting methods), both qualifications and price are important evaluation criteria.

It is an art form to determine, on a case-by-case basis, how to weight the points between qualifications and price.


Leaning Toward Qualifications: If the number of points is too heavily weighted toward qualifications, a public agency will get the most qualified firm, but may end up paying more for the service than could be obtained in a more competitively structured solicitation. This would occur, for example, if qualification related criteria was worth 85 points, while price was only worth 15 points.

Leaning Toward Price: On the other hand, if the number of points is too heavily weighted toward price, a company can essentially buy the contract by submitting a low price, even though they may not be the most qualified firm. This would occur, for example, if the points were reversed from the above example, and qualifications were only worth 15 points, but price was worth 85 points.

Factors to Consider: In making decisions on how to most appropriately allocate the weighting of the evaluation criteria, it is important to think about the following:
  • What type of service you are attempting to procure.
  • The local market and who is likely to bid or propose. Are the firms all qualified?
  • The relative importance of qualifications versus price in meeting your agency's objectives.
  • Is the project on a very tight budget?
  • Is the agency willing to pay more because of the critical need to obtain the most qualified firm?
Qualifications Based Selection: In selecting certain professional services, remember that many government agencies have laws that prohibit the use of price as a selection criterion when selecting architects, engineers, landscape architects, land surveyors, and other licensed professions.

For example, in the State of Washington,
chapter 39.80 of the Revised Code of Washington mandates a Qualifications Based Selection (QBS) process for these disciplines without using cost as a selection criterion. Likewise, the federal government's Brooks Act is also a Qualifications Based Selection process where price may not be used as an evaluation criterion.

Price as the Only Criterion: Other than these regulated professions, many laws require that price be either part of the selection criteria or, particularly in the case of goods and supplies and most public works, often the entire basis on which selection is made.

Alternative Public Works Contracting: In the State of Washington, three alternative public works contracting procedures (Design-Build, Job Order Contracting, and General Contractor/Construction Manager (GC/CM)) require selection partially based on qualifications and partially based on price. See chapter 39.10 RCW for more information or contact me.

Friday, September 5, 2008

RFPs versus RFQs - What's the Difference?

In the selection of consultants, what’s the difference between a Request for Proposals (RFP) and a Request for Qualifications (RFQ)?


Different agencies use different processes and there doesn’t seem to be much unanimity about what each of these terms mean. So here’s one opinion on the difference and when each should be used. I would be very interested in any comments and observations you may have about this subject.


A proposal in response to a Request for Proposals generally has three major elements.


First, as the name suggests, a Request for Proposals requests that consultants submit a “proposal” about how the consultant would approach the consultant engagement being solicited. An agency should use an RFP when the service being sought might be performed differently depending on who is selected. The public agency wants to get the benefit of various ideas and approaches. In evaluating an RFP, one of the evaluation criteria should be an evaluation of the proposal and how creative it is and how closely it meets or doesn’t meet the agency’s objectives.


Second, in addition to asking how the consultant would perform the work, the RFP also asks who would perform the work. Thus, the proposal should include some information about the specific personnel who would be assigned to the work and their relevant experiences, and this would be a factor in the evaluation of the proposals.


Third, the proposal should include the consultant’s proposed price or pricing structure for performing the work, something that also would be evaluated as part of the selection criteria by the public agency.


Under an RFP, a public agency wants to get the best financial deal from the most qualified consultant who has the most effective and creative solution to meet the agency’s objectives.


A Request for Qualifications generally requests only the qualifications of the personnel who would be assigned to perform the work, and does not ask for the consultant’s proposal or approach, nor does it ask about the consultant’s price for performing the work. Generally, an RFQ is used when the public agency is required by law to select certain disciplines of consultants under what is known as “Qualifications Based Selection.” Frequently used in the selection of architects and engineers, Qualifications Based Selection is a process whereby the public agency selects the most highly qualified firm without regard to price, and then enters into negotiations with that firm. In Washington State, chapter 39.80 RCW, requires public agencies to use Qualifications Based Selection when obtaining the services of architects, engineers, landscape architects, and land surveyors.


If an public agency is not bound by Qualifications Based Selection laws, it is a better idea to use an RFP where price can be a factor in the selection process along with the qualifications and approach of the consultant to perform the work.

Friday, August 29, 2008

No Sole Source Selection of Architects and Engineers

In Washington State, selection by public agencies of architects, engineers, landscape architects, and land surveyors is governed by the provisions of chapter RCW 39.80. This law establishes a process for selecting consultants in these four disciplines.

Public agencies are required to select the “most qualified” firm and not use price as an evaluation criterion.

RCW 39.80.060 does have an exception for emergencies. When the public agencies makes a finding that an emergency situation exists that requires the immediate execution of a contract, the provisions of chapter 39.80 RCW are waived.

However, there is no such exception for what might be considered to be sole source providers of services. Public agencies must go through a selection process as outlined in the law or, if the situation is an emergency, then a consultant may be selected without following the prescribed procedures.

Saturday, March 1, 2008

ESSB 6235 Pulled from Committee Agenda

On Thursday morning, February 28th, the House Committee on Local Government pulled ESSB 6235 from the scheduled hearing planned for that morning. This means that the bill won't be considered further for this session of the Legislature.

I consider this a positive step as the expansion of qualifications based selection into construction and project management would not be in the public's best interests. The bill would have prohibited public agencies from using cost as a selection criterion for these services. Government agencies should have the right to obtain competitive prices and help reduce costs.

Thursday, February 21, 2008

ESSB 6235 Passes Senate

Engrossed Substitute Senate Bill 6235 passed the Senate on February 19th with a vote of 33 yeas, 15 nays, 1 absent. In the House, it has been referred to the State Government and Tribal Affairs Committee, where, hopefully, it will not see the light of day.

As I've written before, this legislation is in response to the audit conducted by the State Auditor's Office of the Port of Seattle. If approved, it would prohibit government agencies from using cost as a selection criterion in selecting consultants for project management, construction management, and construction supervision related to a public works project. This is not in the public's best interest as no competitive prices are received. Agencies would be required to select the most qualified consultants and then negotiate a price, rather than having a competitive price submitted as part of the selection process. It is not an appropriate means to address concerns about the Port of Seattle's selection of consultants.

Saturday, February 9, 2008

SSB 6235 Expands Qualifications Based Selection

Substitute SB 6235, as it passed out of the Senate Government Operations and Elections Committee, is now online at http://apps.leg.wa.gov/billinfo/summary.aspx?bill=6235&year=2007. The bill has been sent to the Rules Committee.

The version that was approved adds the following three disciplines to the list in RCW 39.80 that may only be selected based on qualifications (not including price): project management, construction supervision, and construction management. Deleted from the earlier version of the bill that was considered by the committee are environmental services, technical testing, and inspection.

My understanding is that the bill is being pushed by the engineering industry group (ACEC - American Council of Engineering Companies).

As I've written previously, this bill is not in the public's best interest in that it would put public agencies at a disadvantage in having to negotiate prices for additional types of consultant work (in addition to what RCW 39.80 already requires for architectural, engineering, landscape architectural, and land surveying).

There has been a request for the Capital Projects Advisory Review Board (CPARB) to consider, and hopefully take a position opposed to the bill, at their meeting next Thursday.

Friday, February 1, 2008

Substitute SB 6235 - Poor Public Policy

SB 6235 was introduced in response to the recent audit of the Port of Seattle conducted by the State Auditor’s Office. In fact, the recommendations in SB 6235 exactly match the recommendations that the auditors made to the Legislature. On Thursday, January 31, 2008, there was a public hearing on the bill – actually, according to my information – on a substitute bill. As of this writing, however, the substitute bill has not been posted to the Legislature’s website. However, I have reviewed a copy of it, and will be glad to e-mail it to you upon request.

One of the most problematic sections of SB 6235 was an attempt to redefine “public work” to include consultant services and architectural and engineering services, something that doesn’t make much sense. If approved in that format, it would require these consultant services to be bid based on price, a direct contradiction of RCW 39.80 requiring that four disciplines be selected based on qualifications and then negotiating the price with the most qualified firm. The four affected disciplines are architectural, engineering, landscape architectural, and land surveying. The current practice under RCW 39.80 is known as Qualifications Based Selection.

Under the substitute bill for SB 6235, the redefinition portion of public works is eliminated. However, it is replaced with an equally problematic structure, and one that doesn’t make a lot of sense in light of the Port of Seattle audit, and goes in the opposite direction of the original bill that would require more types of work to be bid. Part of the substitute bill would change and add definitions to RCW 39.80, the A&E Qualifications Based Selection statute, so that fewer types of contracts would actually be bid.

In the substitute bill, a new definition of “other construction-related services” would be added as follows: “’Other construction-related services’ means other consultant services provided by any person, other than as an employee of the agency, in connection with and furtherance of any public work, including project management, construction supervision, construction management, land surveying, environmental services, technical testing, and inspection services. Other construction-related services do not, however, include legal services, accounting or auditing services, claims consultant services, or other similar services that may be required in connection with any public work.”

Another new definition of “Public work consultant services” is also added in the substitute bill meaning “architectural, engineering, and other construction-related services provided by a consultant.”

The impact of these new definitions is to add new categories to a Qualifications Based Selection process (project management, construction supervision, construction management, land surveying, environmental services, technical testing, and inspection services). This flies in the face of the Port of Seattle audit in which the Port was criticized for not selecting consultants in a competitive manner. Under this proposal, an agency could no longer use price as one of the factors in selection. In other words, none of the work of “other construction-related services” could be bid, nor could price even be one factor in the evaluation process. Instead, agencies would be forced to select the most qualified firm, and then negotiate with the firm, a practice that puts the agency at a disadvantage in obtaining the best possible price.

Furthermore, the substitute SB 6235 is flawed in that it defines “land surveying” twice. Under the current statute, land surveying is part of what is already covered by RCW 39.80 as it is within the professional practice defined in chapter 18.43 RCW and referenced in RCW 39.80. In the proposed definition of “other construction-related services” land surveying is also added to that list.

One of the critical distinctions between the current four disciplines covered under Qualifications Based Selection (architectural, engineering, landscape architectural, land surveying) and the proposed additional disciplines is that the current disciplines each require registration or licensing in the State in order to practice that discipline. None of the proposed additional disciplines meets that test of being a licensed profession.

Clearly the intent of substitute SB 6235 is directed at port districts. Notice that in Section 9 of the substitute bill, it specifically indicates that port districts must comply with chapter 39.80 RCW “in the procurement of all architectural, engineering, and other construction-related services.”

The problem with the substitute version of SB 6235 is that it is not good public policy for it removes from the competitive bidding arena a number of types of work that have been traditionally selected based on both qualifications and price. The proposed legislation would require selection only based on qualifications. I’m not sure that the drafters of the legislation understand the negative public policy impacts of attempting to tinker with the law in order to control port districts. Or maybe they do understand better than I think and this is an attempt by business to gain an upper hand in contract pricing with public agencies. Instead of having to live with their bid, firms in the disciplines to be added would negotiate with the public agency – a practice that puts the agency at a clear disadvantage.

Different sections of Washington state law are highly interconnected and without a clear understanding of those sections, attempting to make changes often results in negative unintended consequences.

There are other important technical flaws to the legislation. It proposes adding “consulting, architectural, engineering, or other services” to RCW 39.30.020 where it is stated that violations by an agency official of any law or regulation “requiring competitive bidding” subjects the official to civil penalties. The problem is that “consulting, architectural, engineering, or other services” do not require competitive bidding, especially if the other provisions of the substitute bill are adopted that would remove from competitive bidding the disciplines noted under the proposed definition of “other construction-related services.”

The proposed legislation also deals with other issues as well.

Bottom line: the substitute SB 6235 is a poorly thought-through piece of legislation that would have negative impacts on the public’s ability to obtain services at competitive prices – just the opposite of what the State Auditor argued for in their audit of the Port of Seattle. It should be opposed vigorously by public agencies. The views in this blog represent my personal opinions alone.

Monday, January 14, 2008

Proposed Change in Definition of "Public Works"

Senate Bill 6235 has been introduced in the 2008 session of the Washington state Legislature. The bill is in response to the critical audit of the Port of Seattle conducted by the Washington State Auditor's Office. Among other things, the bill would expand the definition of "public works" to include consultant, architectural, engineering, and service contracts. The following is a quick analysis of some of the impacts of the legislation:

  • All consultant contracts would need a payment and performance bond.
  • If such bonds are even available in the market, it would increase the cost of these projects as consultants had to cover these costs. The relationship between the performance bond and professional liability insurance is unclear.
  • Retainage would need to be withheld on every consultant contract, and agencies would need to establish a final acceptance date for every consultant contract.
  • Claims could be filed against the bond and retainage by sub-consultants.
  • Retainage could not be released until the deadlines outlined in RCW 60.28.
  • Prevailing wages would apply to all consultant services. L&I has not established wages for professional services and establishing such wage rates would be very problematic.
  • All consultant work would need to be bid and awarded to the lowest bidder instead of selecting based on qualifications and price in some instances.
  • The draft legislation conflicts with RCW 39.80 that requires that architects, engineers, landscape architects, and land surveyors be selected based on the "most qualified" firm. Under the proposed legislation, the work would need to be bid and awarded to the lowest bidder - a direct conflict with RCW 39.080.