Monday, June 4, 2012

Avoiding the Front Page of the Newspaper: Why Ethics Matters

Enduris' Office Building
On May 16, 2012, I was in Spokane, Washington providing training to the Board of Directors of Enduris, a public risk management pool.  Enduris has a policy that its Board be trained annually on ethics. I trained them last year, and I was honored to be invited back again this year. 

Outline of training:  The training lasted a little over an hour, although we could have easily spent more time discussing some of the issues, had the Board's agenda had permitted it.  Here's an outline of the training.
  • Why should we talk about ethics?
  • Public service is a public trust
  • What's so important about appearances?
  • 8 areas of ethical risk 
  • 5 keys to making ethical decisions
  • Strategies for dealing with ethical lapses
  • 7 risks of ethical lapses
  • What ethics laws and standards apply?
  • Resources
8 areas of ethical risk:  The 8 areas of ethical risk that we looked at, primarily through the lens of recent news stories of public agencies who have experienced headline news, were:
  1. Embezzlement
  2. Waste of government resources
  3. Sexual misbehavior
  4. Private use of public resources
  5. Outside employment
  6. Conflicts of interest
  7. Contracting
  8. Gifts
Practical steps:  We talked about the importance of public agencies having a code of ethics, ensuring that all staffed are trained on ethical expectations regularly, and of creating systems and cultures that provide checks and balances with sufficient independent oversight.
Mike Purdy's Public Contracting Blog 
© 2012 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Sunday, June 3, 2012

May Public Agencies in Washington Prequalify Contractors?

Are public agencies in the State of Washington authorized to prequalify contractors on public works projects?  

CPARB discussion:  This was a question that was recently the subject of a discussion at the May 10, 2012 meeting of the Capital Projects Advisory Review Board (CPARB).   At issue were complaints filed by contractors against a city with a prequalification process.

What is prequalification?  Under prequalification, a public agency conducts a separate evaluation process to determine which contractors meet specific criteria and are thus able to submit bids.  

What agencies are authorized to prequalify?  In Washington State, only three types of public agencies are specifically authorized in state law to use prequalification:
  • WSDOT (State Department of Transportation) for highway work - RCW 47.28.070
  • Public Utility Districts (PUDs) for electrical work - RCW 54.04.085
  • Cities or towns owning an electrical utility for electrical work - RCW 35.92.350
Are agencies prohibited from prequalifying contractors?  The general interpretation has been that since the Washington State Legislature has specifically authorized only certain types of agencies to use prequalification, that the authority does not exist for other public agencies to prequalify contractors. 

Attorney General opinion:  The issue of prequalification authority was addressed in an Attorney General opinion from 1993 to the University of Washington.  That opinion concluded that the University did not have authority to require that contractors have an apprenticeship program as a prequalification requirement.

How can agencies get qualified contractors?  While the prequalification process prior to bidding is not authorized, public agencies are authorized to utilize supplemental bidder responsibility criteria.  After bid opening, the agency requests the low bidder to submit specified documentation demonstrating that they meet the published criteria. In order to be determined to be a responsible bidder and awarded the project, the low bidder must meet the supplemental bidder responsibility criteria. 

Resources for responsibility criteria: 
  • RCW 39.04.350 addresses supplemental bidder responsibility criteria
Mike Purdy's Public Contracting Blog 
© 2012 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Wednesday, May 30, 2012

Training: Developing and Managing RFPs and RFQs

Developing and Managing RFPs and RFQs

When:  
Instructor:  Mike Purdy

Class Outline:
  • Building the Public's Trust
  • Planning the Procurement
  • Standard Provisions and Concepts
  • Conflicts of Interest
  • Cost and price Analysis
  • Advertising Issues
  • Pre-Submission Meeting
  • Receiving and Opening Proposals
  • Evaluation Committee
  • Evaluation Proposals 
  • Managing Interviews
  • Recommending Award
  • Contract Negotiations
  • Developing Scopes of Work

Cost: 
  • Free - WCIA Members
  • $115 - Non-WCIA Members
Information and Registration:  Click here.
Mike Purdy's Public Contracting Blog 
© 2012 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Job Opening: Construction Contract Officer


Oregon State University (OSU)
  • Position:  Construction Contract Officer
  • Location:  Corvallis, Oregon
  • Closing Date:  June 3, 2012
  • Salary:  $55,000 to $65,000
  • Job Summary: The Construction Contract Officer will support Procurement and Contract Services as a member of their management team through development, implementation, and ongoing support of University-wide procurement and contract policies and practices. The duties of the Construction Contract Officer involve managing procuring the services necessary to construct, protect, repair, maintain, and preserve the physical facilities and utility systems of the University. This position provides guidance to the University for a wide variety of complex and diverse contractual issues. 
  • For More Information and to Apply:  Click here.  
Mike Purdy's Public Contracting Blog 
© 2012 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Tuesday, May 29, 2012

Washington State Contract with Builders Exchange to Expire in July

For the last dozen years, the Washington State Department of General Administration (GA), now known as the Department of Enterprise Services (DES), has been under contract with Builders Exchange of Washington, Inc. to provide electronic posting of public works bidding documents online.

Contract Expires in July:  The state's contract with Builders Exchange will expire on July 31, 2012 and the state has chosen not to conduct a new competitive selection process for another contract for these services. 

Piggybacking:  Many state and local public agencies have piggybacked off of DES' selection process and contract, and used Builders Exchange as the vehicle to make bidding documents available to contractors and subcontractors.
  • Office of State Procurement (OSP):  For the first six years of DES's contracting with Builders Exchange, the Office of State Procurement (OSP) managed the contract, and some members of the state's Purchasing Cooperative Program piggybacked off of OSP's contract. 
  • Engineering and Architectural Services Division:  For the last six years, DES' contract has been managed by their Engineering and Architectural Services Division, and some agencies may have entered into an Interlocal Agreement with DES to piggyback off of the Builders Exchange contract.
  • No piggybacking:  Other agencies have used Builders Exchange without piggybacking off of any state contract with the assumption that their expenditures were under their competitive bid thresholds for services.
Impact on local agencies:  Because many public agencies have chosen to piggyback off of the state's contract for these services, DES' decision to not conduct a new solicitation process will have an impact on agencies who have relied upon the state's contract. 

Options for bid document distribution:  Without a DES contract that local agencies may piggyback off of, there are five basic options for agencies to provide access to bidding documents:
  • Local Agency Website:  An agency could develop its own system and host the documents on its own website.  Some agencies already do this.
  • Competitive Selection Process:  An agency could conduct a competitive selection process, consistent with its own contracting requirements, and select a company to provide online access to bidding documents. 
  • Piggybacking:  An agency conducting a competitive selection process could make its selection process and contract available to other agencies to use through piggybacking with the use of an Interlocal Agreement.
  • Contract Directly without Competition:  Some public agencies may be able to contract directly with Builders Exchange or another provider of these services if the dollar amount of such services is less than any competitive bid limits that may exist under state law for that particular type of agency.  Bid limits are dollar amounts below which public advertising is not required, and these vary widely by type of agency.  Builders Exchange has indicated they intend to reduce their fees to public agencies who continue to use their services.
  • Hard Copies:  A public agency may choose to not make bidding documents available electronically, but only provide a hard copy of the documents to contractors and subcontractors, either for free, or upon payment of a refundable or non-refundable deposit.
Policy Issues:  As our society and the construction industry moves more and more toward reliance on electronic documents rather than hard copies, the following policy issues should be considered by public agencies:
  • What firms should distribute documents?  There are a number of other companies besides Builders Exchange that provide similar online services.  How should a public agency make the decision about what company should distribute the bidding documents?  If a public agency spends more than its competitive bid threshold to make its bidding documents available online, they will need to conduct a competitive selection process to obtain the services of an online plan center or organization to post the documents online..
  • Who should pay to access documents?  In the interest of increasing competition on public works projects, it is beneficial for agencies to have their bidding documents available to a wide array of contractors and subcontractors at little or no cost.  Under some models, a public agency pays for the documents to be posted online, while other models have the contractors and subcontractors pay to access the documents. 
  • What system is most convenient for the users?  Agencies should consider issues such as accessibility of the bidding documents to small contractors and the ability of contractors and subcontractors to easily print relevant documents.
Access to DES bidding documents:  DES intends to provide a PDF of its bidding documents to a number of plan centers for electronic access by bidders.  Builders Exchange will be one of the plan centers that DES sends their documents to.  However, because DES does not plan to pay Builders Exchange the per page fee (or pay a fee to any of the plan centers), DES' bidding documents will only be made available by Builders Exchange and other plan centers to paying contractor members of those plan centers, and will not be accessible by contractors or the general public who are not paying members.  

Mike Purdy's Public Contracting Blog 
© 2012 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Monday, May 28, 2012

50 Years Ago: President Kennedy's Memorial Day Proclamation

I hope and trust you enjoyed a good Memorial Day weekend with family and friends!  

It's good to pause and remember those brave men and women in our military who have given their lives in conflicts through the years so that we might remain a free nation.
 
On May 18, 1962, President John F. Kennedy issued his Memorial Day Proclamation, which is reproduced below.  His words are still relevant to our nation today - even 50 years later.

        President Kennedy's Memorial Day Proclamation

Whereas the supreme and selfless sacrifice of those who gave their lives on the field of honor have made it possible for succeeding American generations to remain free and enjoy the spiritual and material blessings of our free society; and 

Whereas the courage and ideals of our noble dead have contributed to the advancement of the cause of world freedom and stand as an inspiration to us all; and 

Whereas in our time we face a challenge which demands of us the same virtues of loyalty, courage, and devotion to country that characterized our fallen heroes; and 

Whereas Memorial Day each year provides a fitting occasion upon which Americans may not only pay tribute to our honored dead but also unite in prayer for success in our search for a just and lasting peace; and 

Whereas to this end the Congress, in a joint resolution approved May 11, 1950 (64 Stat. 158), requested the President to issue a proclamation calling upon the people of the United States to observe each Memorial Day as a day of prayer for permanent peace: 

Now, Therefore, I, John F. Kennedy, President of the United States of America, do hereby urge the people of the United States to observe Memorial Day, Wednesday, May 30, 1962, by invoking the blessing of God on those who have died in defense of our country, and by praying for a new world of law where peace and justice shall be assured for all; and I designate the hour beginning in each locality at eleven o'clock in the morning of that day as the time to unite in such prayer. 

I also urge the press, radio, television, and all other media of information to cooperate in this observance. 

In Witness Whereof, I have hereunto set my hand and caused the Seal of the United States of America to be affixed. 

DONE at the City of Washington this Eighteenth day of May in the year of our Lord nineteen hundred and sixty-two, and of the Independence of the United States of America the one hundred and eighty-sixth.

Mike Purdy's Public Contracting Blog 
© 2012 by Michael E. Purdy Associates, LLC 
http://PublicContracting.blogspot.com

Wednesday, May 23, 2012

State Charged with Public Works Procurement Process Reform

Under the terms of legislation approved this year, the Washington State Department of Enterprise Services (DES) will be conducting an ambitious review of the state's current public works procurement processes and will make reform recommendations.  

The state's capital budget bill (ESB 6074 - Section 1022) outlined the charge to DES but allocated only $75,000 to complete the quick turn-around study.

Focus of report:  Because of the limited funding for the study, DES may concentrate some of its focus on state agencies, although the legislation broadly applies to the state's "current public works procurement processes."  The report is required to include historical data on:
  • Use of change orders
  • Use of Job Order Contracting
  • How competitive public works contracts are advertised
  • Contract closeout procedures
In addition, DES told the Capital Projects Advisory Review Board (CPARB) on May 10, 2012 that the study may address a number of other topics, including the following:
  • Best value procurement
  • Use of electronic signatures
  • Standardizing bidding thresholds for all agencies
  • Prequalification of contractors on Design-Bid-Build projects
Labor union concerns:  The impetus for the study came from the state employees labor union (Washington Federation of State Employees) and the impact that some public works processes are having upon their work.  For example, union representatives expressed concern in testimony to the Legislature that some public works change orders are outside the original scope of work of the project and represent work that state employees, and not contractors, should be performing.

Stakeholder input:  In developing its report and recommendations, DES may consult with the Capital Projects Advisory Review Board (CPARB) for advice and assistance, and will also solicit input from various stakeholders. 

Other concurrent studies:  In addition to the study being conducted by DES, two other organizations are conducting reviews of public works contracting, specifically the alternative public works contracting processes authorized by RCW 39.10:
Public works legislation in 2013:  It is anticipated that next year the Legislature will be reviewing significant legislation addressing public works procurement and contracting procedures:
  • CPARB:  CPARB's intent is to recommend legislation to the Legislature in January 2013.  That legislation will take into account recommendations from JLARC as well as CPARB's Reauthorization Subcommittee.  It is anticipated that the legislation will make recommendations for certain changes to the GC/CM, Design-Build, and Job Order Contracting laws, and will authorize continuation of these alternative methods beyond June 2013, which is when the current law expires. 
  • DES:  DES is required to submit its report to the Legislature and Governor by December 15, 2012, and to include draft legislation to implement the recommendations in its report.  This legislation will also presumably be considered by the Legislature in 2013.
Overlap between studies:  All three reviews (DES, CPARB, JLARC) will be examining Job Order Contracting processes and practices.